
Typically, one geotechnical boring is made in the vicinity of each proposed column on an elevated structure, in order to understand subsurface conditions to design the drilled shaft. The soil drilling should be of adequate separation (typically measured in pier diameters) from the column location, such that the drilling does not affect the bearing stress nor skin friction of the native ground (see image below).